EPCOR Territory

Edmonton and Area Solar Installation

Solar Power for EPCOR Customers in Edmonton and Area

Range Road Solar is an owner-operated Alberta installer that has completed hundreds of installs across Alberta, from infill homes in southwest Edmonton to acreages with shops, heated garages, and three-phase service in the counties around the city. If your meter belongs to EPCOR, we handle the two approvals your install needs: City of Edmonton permits and the EPCOR micro-generation interconnection. Send us a recent power bill and we will show you what your roof or yard can produce, with a straight answer on payback. Call (587) 330-7502 to start.

Why Solar Makes Sense in EPCOR

Edmonton averages roughly 2,300 hours of bright sunshine per year, among the most of any major Canadian city, and the long days from May through August regularly push a good roof past its own usage. Under Alberta's Micro-Generation Regulation, every surplus kilowatt-hour exports to the grid and comes back as a credit at your retail rate. That summer surplus is what carries your winter bills. Whether solar pencils out comes down to your usage pattern, and these are the three profiles we see most often on Edmonton-area power bills.

City bungalow

Power bill of $150 to $220 per month

A 7 to 9 kW roof system usually covers a full year of usage, and many bungalows still have garage roof space to spare.

Acreage with shop and heated garage

Power bill of $350 to $500 per month

The strongest payback cases we build. High winter draw paired with heavy summer exports from a ground mount or shop roof.

New infill with an EV

Power bill of $200 to $300 per month

Size the array for the car and the house together so both run mostly on your own production.

Edmonton averages roughly 2,300 hours of bright sunshine per year, one of the highest totals of any major Canadian city. Long summer days do the heavy lifting on your annual production.

Designed for Rural Electrical Systems

EPCOR owns the wires, the transformers, and your meter inside Edmonton. Cross the city boundary into Strathcona County, Sturgeon County, or Leduc County and most acreages sit on FortisAlberta service instead, with ATCO Electric and EQUS lines further out. Your wire service owner controls your micro-generation application, any interconnection review, and your meter swap, so getting the utility right is the first step of every design we produce. We file with EPCOR for city installs and with FortisAlberta for county installs every week, and the checklist below is standard on every job either way.

Voltage rise assessment
Ground and rooftop options
Wind-rated racking systems
Single and three-phase service
Utility interconnection filing
Permit coordination

The Installation Process

01

Power Bill Review

We review the 12-month usage graph on your most recent power bill to understand your consumption patterns and identify the right system size.

02

Site Assessment

We visit your property to assess roof or ground conditions, shading, electrical service, and interconnection requirements.

03

System Design

We produce a system layout, production estimate, and cost summary based on your site and usage data.

04

Permits and Interconnection

We apply for the City of Edmonton building and electrical permits and submit your micro-generation application to EPCOR, or to the county and FortisAlberta on acreage work.

05

Installation

Our crew installs the racking, panels, inverter, and electrical connections. Work is performed by licensed electricians.

06

Commissioning and Inspection

The system is commissioned, passes inspection, and EPCOR swaps in your bidirectional meter so your exports start earning credits on your next bill.

Frequently Asked Questions

Alberta runs on net billing under the Micro-Generation Regulation, not the old net metering where a meter simply spun backward. Every kilowatt-hour you export is measured by a bidirectional meter and credited at your retail rate, so July production comes back as credits against your January bills. The catch is the annual true-up: surplus credits beyond your yearly consumption settle at a lower value than a normal bill offset. That is why we size systems to your actual 12-month usage rather than maxing out your roof.

Yes. Panels produce from light, not heat, and cold panels actually perform better than hot ones. Edmonton averages roughly 2,300 hours of bright sunshine a year, and a clear day at minus 20 can be a strong production day. Snow cover blocks output until it sheds, so we set roof tilt angles that shed snow and we count December and January as your lowest months when we project your annual numbers.

We do. The application goes to your wire service owner, which is EPCOR inside Edmonton city limits. We prepare the application, the electrical drawings, and the interconnection paperwork, then coordinate the bidirectional meter swap with EPCOR. You sign the consent forms and we handle everything else as part of the installation, at no extra charge for the paperwork.

Yes. For an in-city install there are two approvals: the City of Edmonton building and electrical permits, and the EPCOR interconnection approval. We handle both. On acreages in Strathcona, Sturgeon, or Leduc County, the county issues the permits and FortisAlberta handles the interconnection instead of EPCOR. We file in both systems every week, so the process feels the same to you either way.

Installed pricing typically runs $2.25 to $2.85 per watt for a roof mount and $2.50 to $3.50 per watt for a ground mount. An 8 kW roof system works out to roughly $18,000 to $22,800, while a 12 kW ground-mounted system runs about $30,000 to $42,000. Your 12-month power bill and the space available determine where your quote lands in the range, and we give a firm number after a site visit.

Plan on two to six weeks from design approval to your system producing power. City of Edmonton permits and the EPCOR interconnection review run in parallel, and the on-site work for most city homes takes one to three days. Ground mounts and larger acreage systems can run longer because of racking, trenching, and county permit timelines.

Yes. Edmonton gets roughly 2,300 hours of bright sunshine a year, among the best of any major Canadian city, and Alberta retail power rates are high enough that a right-sized system typically pays back in about 8 to 12 years from bill savings alone. Panels carry 25-plus year performance warranties, so the payback period is only the first third of the system's working life.

See what our clients say

Real reviews from Alberta homeowners and farmers.

Read Google Reviews

Get a Free Solar Assessment

We serve Edmonton and the surrounding acreage counties on both EPCOR and FortisAlberta service. No obligation.

Also Serving Nearby Areas

Strathcona CountySturgeon CountyLeduc CountyContact UsSolar Cost Guide

Ready to Assess Your Property?

Send us a recent EPCOR power bill and we will review your 12-month usage and give you a straight answer on what solar can do for your property. If the numbers do not work, we will tell you that too. Jonathan, Range Road Solar

Book a Call (587) 330-7502