FortisAlberta Owns the Wires. It Is Not Your Power Company.
This trips up a lot of people, so it is worth stating plainly. FortisAlberta is a distribution utility: it owns and maintains the poles, transformers, and distribution wires that physically carry electricity to your property, and it owns your meter. It is regulated by the Alberta Utilities Commission, which approves the distribution and transmission charges on your bill. FortisAlberta does not sell you electricity and does not set your energy rate. That is your retailer's job, and in Alberta's deregulated market you choose that retailer yourself, whether it is a large provider or a smaller independent one, entirely separately from who owns the wires to your house.
For solar, this matters in a specific way: FortisAlberta's job is to approve your interconnection application and install a bi-directional meter that separately tracks the power you pull from the grid and the power your panels export to it. Your retailer is the one who actually credits you for that exported power on your monthly bill. FortisAlberta does not write you a check for excess solar production. It reads the meter and reports the numbers. This is also why going solar does not zero out your bill entirely: FortisAlberta's fixed distribution and transmission charges keep showing up regardless of how much of your own power you generate, because you are still connected to, and relying on, its grid.
Alberta receives over 2,300 hours of sunshine per year, among the highest solar resource levels of any Canadian province, and most of FortisAlberta's central and southern service territory sits well within that range.
A Territory Bigger Than Most People Realize
FortisAlberta is the largest electric distribution utility in the province by geographic reach. It operates in roughly 240 communities across more than 50 counties and municipal districts, stretching from the U.S. border in the south up to Conklin in the north, and it delivers power to close to 600,000 residential, farm, and business accounts. That footprint covers a huge amount of variation: full-quarter grain farms in the east-central part of the province, cattle operations and acreages in the foothills, and small-town residential subdivisions that look nothing like a working farmyard but are still on the same distribution system.
Because the territory is so broad, "FortisAlberta customer" does not describe one type of property or one type of solar project. A farm at the end of a long single-phase rural line has different interconnection considerations than a bungalow on a serviced lot in a small town, even though both are billed by the same distribution utility and go through the same micro-generation application. Part of our job is knowing which parts of that difference actually change the design and which parts are just paperwork.
What the Micro-Generation Interconnection Actually Involves
For a typical home, acreage, or farm solar system, which almost always falls under 150 kW, FortisAlberta processes the interconnection through an online system called PowerClerk. The application package includes a Micro-Generation Notice (Form A), a site plan, a single-line electrical diagram, your FortisAlberta site ID (a 13-digit number printed on your bill, starting with 0040), and documentation of your existing consumption. If we are managing the application for you, we also submit a signed authorization so FortisAlberta will deal with us directly on the technical back-and-forth instead of routing everything through you.
Once FortisAlberta confirms the application is complete, it issues an interconnection agreement, which is the contract that formally allows your system to connect to its distribution network. You cannot legally energize the system before that meter swap happens: the existing meter has to be replaced with a bi-directional one that reports two separate readings, import and export, so your retailer can credit the export correctly. After your installation passes electrical inspection, we submit the permits and inspection report to FortisAlberta, which then schedules the meter change and grants permission to operate.
Here is a detail worth knowing if you have heard horror stories about utility solar delays: FortisAlberta's interconnection team was genuinely overwhelmed for a period as residential solar applications quadrupled after 2022, with a five-person team handling roughly 325 applications a month by hand, and some applications reportedly took as long as 50 to 80 days to process. FortisAlberta has since automated that workflow through PowerClerk and has publicly reported cutting its average processing time by more than 80 percent, down to an average of roughly 7 to 14 days for the utility's own review step. That is a genuine, documented improvement, not a marketing claim we are inventing. It does not mean your whole project takes two weeks. Design, permitting, installation, and inspection still add time on top of FortisAlberta's own turnaround, so plan on a realistic total of roughly two to three months from signed contract to permission to operate for a straightforward residential or farm system.
How Net Billing Actually Works Once You Are Connected
Once your bi-directional meter is active, FortisAlberta reads and reports two numbers every billing cycle: how much power you imported from the grid and how much your system exported to it. Alberta's provincial Micro-Generation Regulation is what actually governs how that exported power gets credited, and it applies the same way across every distribution utility in the province, FortisAlberta included. Your retailer, not FortisAlberta, applies the credit to your bill, and small generators are typically credited at the same per-kWh rate they pay for power they import, though this is a retailer contract term and it is worth comparing offers, since some retailers structure export credit differently than others. Unused export credits generally carry forward for a period before they expire rather than being paid out as cash, so a system sized well above your annual consumption will not simply generate an income stream; it is meant to offset your own usage, not run as a small power plant.
The one piece that never goes away, no matter how much power you generate, is FortisAlberta's distribution charge. That fee pays for maintaining the poles, transformers, and lines you are still connected to and still depend on at night, in winter, and any time your panels are not producing, so a realistic solar quote should never promise a zero-dollar bill. What it should promise is a substantially smaller one, sized around your actual 12-month usage history rather than a generic estimate.
Farm, Acreage, and In-Town: Different Properties, Different Designs
Rural properties in FortisAlberta's territory often have electrical service characteristics that differ from a standard in-town lot. Longer distribution runs can mean more voltage variation, some farm services are still single-phase where a large shop, grain dryer, or irrigation pivot would benefit from three-phase power, and older meter bases or panels sometimes need upgrading before a system can be safely interconnected. On a farm or larger acreage with open land available, we more often land on a ground-mount array, since it sidesteps roof orientation and shading problems and keeps the array clear of future buildings. In town, or on a smaller rural residential lot, rooftop is usually the more practical and more affordable option.
Pricing reflects that difference. Roof-mount systems typically run $2.25 to $2.85 per watt installed. Ground-mount systems typically run $2.50 to $3.50 per watt installed, because of the added racking, footings, and often a longer electrical run back to the service panel. As a rough illustration: a 7 kW roof-mount system priced at the low end works out to roughly $15,750, and the same size at the high end runs closer to $19,950. A 10 kW ground-mount system, more typical for a farm with higher consumption, runs roughly $25,000 at the low end of that range up to $35,000 at the high end. Actual pricing depends on your roof or site conditions, panel and inverter selection, and any electrical upgrades your service requires, which is exactly why we quote from a site visit and your real usage data rather than a flat number.
From Power Bill to Permission to Operate
Power Bill Review
We review the 12-month usage graph on your most recent power bill and your FortisAlberta site ID to understand your consumption pattern and identify the right system size.
Site Assessment
We visit your property to assess roof or ground conditions, shading, service entrance, meter base, and panel capacity before finalizing a design.
System Design
We produce a system layout, production estimate, and cost summary priced within our published roof-mount and ground-mount ranges based on your site and usage data.
Permits and Interconnection
We apply for building and electrical permits and submit your Micro-Generation Notice (Form A) and single-line diagram to FortisAlberta through its PowerClerk portal.
Installation
Our crew installs the racking, panels, inverter, and electrical connections. Work is performed by licensed electricians.
Commissioning and Inspection
After electrical inspection, FortisAlberta issues the interconnection agreement, swaps in a bi-directional meter, and grants permission to operate.
Frequently Asked Questions
See what our clients say
Real reviews from Alberta homeowners and farmers.
Get a Free Solar Assessment
We serve FortisAlberta and surrounding areas. No obligation.
Also Serving Nearby Areas
Ready to Assess Your Property?
Submit a recent power bill and we will review your consumption and provide an honest assessment of what solar can do for your FortisAlberta property. No obligation.